In partnership with GovMarket Australia's leading data and intelligence on government procurement

Monitor the state of your buildings, parks and roads from your desk.

Our inspectors visit your sites. What they find comes straight to your team: how each asset is changing, when it will need work, and what that work should cost based on what councils have paid. You decide what happens next without leaving the office.

All your sites on one screen

When we last inspected each site, what has most likely changed since, what is due and what it should cost. Your team sees it as soon as we log it.

Two shire council staff at a desk in an outback office looking at the Schema site overview on a monitor, a white ute parked on red dirt outside the window.

Inspected in person

We collect the data ourselves. We drive to your sites, metro or regional, walk them and look at each asset from the ground. Each finding is photographed, rated on your condition scale and priced before it reaches you.

An inspector in hi-vis with a tablet on the brick veranda of a sports pavilion beside a football oval.
Sports pavilion, regional oval
An inspector kneeling on a concrete footpath, measuring a crack with a tape, a tablet on the grass nearby.
Footpath crack, measured
A long crack running through the painted blockwork of a hall wall, seen at ground level.
Cracked hall wall
Rusting corrugated roof sheeting and gutter on a brick building, seen from the ground under a gum tree.
Gutters, from the ground
A pothole in a two-lane rural road lined with gums, with a kangaroo sign on the verge.
Rural road, pothole
  1. On site

    We walk each site and check what can be seen from the ground: paths, furniture, fences, building exteriors and roads. Each asset is photographed, located and rated against your scale. A typical park takes half a day.

  2. Rated and priced

    Each defect is located, rated against your scale, given a recommended action and priced from comparable council contracts.

  3. You decide

    For each defect, choose what happens. The record keeps the decision and the reason.

    • Fix now
    • Leave and watch
    • Plan for next budget

Priced from council contracts

Schema prices defects from GovMarket, our partner, which records tenders and awarded contracts from Australian councils and state agencies. Each defect comes with what it should cost to fix, based on what councils have paid for the same work, and which suppliers nearby have done it.

Cost to fix

Rock beaching, south bankMill Creek footbridge, Wattle Park

$34,000expected, $26k to $42k typical

Each dot is a council contract for similar creek bank works within 300 km, 2022 to 2026.

If left until the footing failsAbout $410,000Bridge replacement, from 6 similar contracts

Who can do it

4 suppliers in your regionHave done this work for councils in the last two years

  • Tallowood Civil18 km away · last council job Mar 20269similar jobs$32kmedian
  • Mill Creek Earthworks31 km away · last council job Jan 20266similar jobs$36kmedian
  • Southbank Erosion Control64 km away · last council job Sep 202511similar jobs$29kmedian
  • Redgum Civil88 km away · last council job Jun 20254similar jobs$41kmedian
Request quotes from all four Send the scope to procurement

Sample view. Suppliers and figures are illustrative.

Pilot with us

We are starting with a small number of councils. A pilot covers a few of your sites for one quarter at a reduced rate, so you can see whether it is useful before committing to more.

Sites
Three to five of your choosing: buildings, parks or roads
Length
One quarter, with two visits to each site
Cost
A reduced fixed fee, agreed up front
Scope
Visual inspection from the ground. Not a structural, safety or compliance assessment.
What you get
The site overview, condition records and costed work shown above
Afterwards
Keep going, change the sites or stop. The records are yours either way.

Talk to us

Email us about a pilot, your sites or a tender. We reply within one business day.

Head office Melbourne, VIC. Working Australia-wide.